Miniature painting deadline preflight
Can this project be finished by the event?
Turn unfinished model counts, your measured stage times, batch overhead and real weekly capacity into a latest start date, required pace, bottleneck and honest shortfall.
Local scenario
Build the deadline preflight
Edit every example value, then calculate. Nothing leaves this page.
Use your own timed batches. The result is a workload preflight, not a promise about quality or event acceptance.
Deadline-first, not another collection tracker
Use your ratesTime a representative batch and replace every editable example.
See the constraintSeparate assembly, priming, painting and basing instead of hiding them in one average.
Reduce scope honestlyIf the window fails, compare whole priority groups in the scope planner.